Transmission Breaker Replacement

Client: Florida Power & Light / NextEra
Location: Multiple areas within the state of Florida
Service: Construction
Project Type: Transmission Breaker Replacement

BIC’s scope included transmission breaker replacement and related substation support for utility clients such as FPL / NextEra, including removal and installation of high-voltage breakers, associated switches and control equipment, cable pulling and terminations, protection and control integration, apparatus testing, functional testing, SCADA checkout, commissioning, and energization support. The work supports grid reliability, transmission system modernization, outage readiness, and the safe operation of critical transmission and substation infrastructure. Examples of such substations include Flatford, Stallion, Ft. Myers Plant and Saddlewood.